Skip to content
ORBIT

Chapter 3 of 6

Make the number fit to use

Keep the definition

The brief, the row, and the comparison can be filled, and the next query can still change what the number means. This page is what I leave in place: who owns the definition, the columns the number promises, and the stop when those columns break.

Operating rule

My operating rule: name the owner of the published definition, check its columns before the next build, and stop the old number when those columns break. A green contract is not the row sentence.

Checked 22 Oct 2026Data analytics field card

What I leave in place

This is the sheet I leave after Name the decision and When two reports don't match are filled. A blank field means the number is not being kept. The columns are dbt's model contract: the list of columns the published table promises, each with a name and a data type. dbt is the tool that builds the tables. When that list breaks, the build raises a contract error, and that error is the stop. The owner is my rule, and it is the approval the analytics field card requires. A change to the sentence of what one row means goes back to Say what one row means. A second report that will not sit on that row goes back to When two reports don't match.125

Owner
The role that approves a change to the published definition. One person, or one role. A mailing list is not the owner. The field is filled when that role can say what one row means. Otherwise the number is not being kept.
Columns
Every column the number promises, by name and data type, with the contract turned on. The build checks that the query returns that shape. If it does not, the table does not build. What one row means stays on the other sheet. This field is the columns.
Break
A removed column, a changed data type, or a removed or changed constraint on a column the number already promised. That is a breaking change, and the build raises a contract error. The old number stops. Adding a column is not a break.
Version
When other people or systems depend on the table, the breaking change is a new version, and the previous version stays for a while so they can move. When nothing outside this team depends on it, the break can land at once. The field is filled when one of those two is named.
Reopen
A change to the sentence of what one row means goes back to Say what one row means. A second report that will not sit on that row, with the column names and types left alone, goes back to When two reports don't match. A change to the decision goes back to Name the decision. A green contract does not close any of those.
Figure 1. What I leave in place

What the columns do not catch

dbt's contract is a promise about the shape of a table that other people and processes query. When it is turned on, the build checks that the query returns every promised column, with the promised data type. The check does not care about column order. dbt recommends a contract for a public table that reports and other systems rely on. A data test is a different check. It runs on the rows after the table has built, and it can be set to warn. The contract fails the build when the shape does not match. I do not use a warning as a substitute for that failure.

A breaking change, in that contract, is removing a column, changing its data type, removing or changing a constraint on it, or removing the contracted table. dbt then shows a contract error. Versions are how the person who owns a table that other teams use can introduce that break: a new version, the latest pointer moved, and a window in which the old version can still be used. dbt says making every consumer take the break at once is reasonable while the table is still changing quickly, or when the group that depends on it is small. Versions do not remove the cost of keeping two shapes. They put a limit on it.

The contract does not know the grain. Kimball's declaration is what one row means, in business words. A query can keep every column name and type and still change which rows are included. dbt says fixing a bug in how a column is calculated is not a breaking change, and it does not need a new version. That fix can still change the definition. When it does, I send it back to Say what one row means. If a second report then disagrees, that comparison is When two reports don't match. A green contract is not that sheet.

The Green Book includes comparisons and reconciliations in ongoing monitoring, and it ties a detective control to a correction that happens in time. I use that as the reason a break stops the next number, rather than waiting for someone to notice that the figure changed. The standard does not describe a model contract. The stop on a broken shape is the contract's. The owner is my rule.1284

Structural contract

The shape the published table promises. dbt's model contract is one way to check it.

  • Column names, types, and required fields
  • A removed column or a changed type stops the old number
  • Adding a column is not a break

Semantic contract

What the row means. The owner can say it. The structural check cannot.

  • Population, grain, and the business rules
  • A quiet change of meaning goes back to the row
  • A new version is not required for every rule change
Figure 2. A green structural contract does not know the row. A new version is for a break that other people must be protected from, not for every change of business meaning.

An example

This is an illustration. I have not measured it, and it states no amount.

The number is the invoice row from the filled comparison: one open invoice as of yesterday, with a partial payment and an open dispute still on the row, and invoices already written off left out. The owner is the role that approved that sentence. The contract includes the column that marks written-off invoices. The decision is still the offer of time.

A change removes that column. The shape breaks. The build stops. The lit sheet is the number that was kept. The cracked sheet is the shape that no longer matches.

The sheet in the tray is the next version. It is not the number until the owner accepts it.

A second change leaves every column name and type in place, and starts treating written-off invoices as included. The contract can stay green. That change goes back to When two reports don't match. This page does not pick a number between the two meanings. If the meeting changes the decision from the offer of time to a call list, that change goes back to the brief.

Figure 3. An illustration. One lit sheet, a cracked sheet, and a sheet waiting in a tray. No amount.

How I would know

I would look at four things. I have not collected them, and I set no target. A green contract that hides a changed row is not the practice.

Unowned
Did a measure go out whose definition has no named owner?
Shape break
Did a build stop because a promised column was removed, or its type changed?
Quiet change
Did the contract stay green while what the row includes changed, and the comparison was not reopened?
Kept version
When a breaking change lands for people who depend on the table, does the previous version stay while they move?
Figure 4. How I would know

Where I do not use it

A table that is still changing, and a search that is not being offered as an answer, do not get a contract. dbt says turning this on while tables are still changing makes later changes harder.

Comparing two reports stays on When two reports don't match.

This page does not publish a midpoint.

The decision, the person who will act, and the moves stay on Name the decision.

A contract does not apply to a seed, a snapshot, a source, or a Python model. A data test can still run on those.

Adding a column is not a breaking change. I do not open a new version for it.

The calendar, the blast radius, and the cutover stay on the technology delivery field card. A slow backtest of probability of default or expected credit loss stays on the Bayesian optimisation card.1267

When AI drafts the number

This still holds when a model drafts the page. The controller has to be able to say the decision, the row, and the cause of a disagreement. A generated explanation is not that cause until they accept it. A green contract in the draft is not the row sentence.

References

  1. dbt Developer Hub, model contracts (read 16 Oct 2026)
  2. dbt Developer Hub, model versions (read 16 Oct 2026)
  3. Kimball Group, Grain (read 16 Oct 2026)
  4. GAO, Standards for Internal Control in the Federal Government, GAO-25-107721 (May 2025)
  5. Data analytics field card
  6. Technology delivery field card
  7. Bayesian optimisation field card
  8. Kimball, declaring the grain